Παρασκευή 26 Μαρτίου 2010

Traditional boatbuilding

The productive and full of enthusiasm days of September, October and November gave way to the infertile boatbuilding days of this years’ winter. People from the boatyard undertook a major project: the building of a 60ft traditional vessel (karavoskaro), which will be used as a touristic coastal cruiser in Crete. Their deadline is by the end of May 2010. The wooden framework of the Golayath took over all the free space in the boatyard so there was no longer space for my tiny catamaran. We had to move it yet for another time. The two hulls were lifted to a balcony high under the yard’s roof, whose floor was used for lofting. I could now continue to complete some small tasks like painting the interior of the lower hulls and installing the floors and banks, while supervising from above the progress in the construction of the large kayki.

The completion of a traditional wooden boat of this size in only seven months is an operation that required all the men power the yard had available. Forty (40…!!?!) tons of hardwood logs (Iroco and eucalyptus) were cut and about 60% of that was used for the keel, stem and sternposts and for the rest of the framework. Every single rib of the boat needed a clark to lift it and hold it in place until it was glued-bolted. The more I watched the progress on this vessel the more I was impressed by the massive construction, but, also, the more the different approach of Wharram’s catamarans to the sea made sense to me. These lightweight crafts, though basically wooden, required only a fraction of the wood needed to build a wooden monohull of the same length (even if the monohull was constructed in the same wood-epoxy method) and based their seaworthiness on their ability to follow the motion of the waves rather than force their way through them. Lower aspect rigs with less sail area are needed to take them sailing in higher speed and only a small outboard is usually enough to maneuver a 30-40 ft long boat in and out of the harbor or motor with low gas consumption for miles and miles. No wonder why this combination of seaworthiness and economy in construction-maintenance has made these vessels so popular.

To my disappointment and also to disappoint the last few (bored to death) readers of this blog, only little progress was achieved in the hull construction during the last couple of months (..sorry Hector!). I managed to cut the banks and floors of starboard hull, reinforce them with pitch pine frames underneath and coat them with epoxy. The area under the floors was sanded and coated with two coats of clear epoxy, then three more layers of Hempels’ Light (epoxy) Primer was applied, before the floors were glued in place. No top paint was used in these areas since they will never be exposed to the sun light and Hempels’ Light Primer is said to be very durable to water and other liquid material that may fill the bilges. The areas under the banks as well as the rest of the inside of the cabins are being painted white with a satin finish, using Hempels’ Multicoat (three layers on top of a total of three coats of clear epoxy).

Meanwhile there was encouraging progress in the construction of the crossbeams which are now finished except for a few triangular section pieces. I am very pleased with the result as first quality Oregon pine in full lengths was used and the crossbeams are relatively light, though very strong! I haven’t yet decided if I will cover them with glass cloth before I paint them as I have heard controversial comments on this technique and Wharram doesn’t recommend it in the plans. Two more beams will be constructed next week to support the fore and after netting, but these will be hollow, round or oval section beams with the same construction as the masts (no plywood frame). The masts themselves will be constructed by the end of April along with the gaffs, tillers and various other small parts as it is my decision to finish with all these time consuming small tasks before the end of May. Then, as soon as the yard staff is available again, I will be able to focus entirely on the finishing of the hulls and the assembly of the boat before the end of the oncoming summer.


Only a third of the hardwood used for the framework!!

Constuction of the keel, stem and sternposts





Ribs in place (stern view)

Ribs (bow view)

Tiki before being lifted to the lofting balcony

Sanding and applying the last coats of clear epoxy on the inside of the lower hulls



Floors and banks reinforced and coated with epoxy before installation






Floor installation


Painting the area under the banks



Crossbeams almost finished!





Σάββατο 10 Οκτωβρίου 2009

Fast forward

It has been a while since my last post, but I am happy to say that construction is in fast forward since I have moved the boat to Vasiliadis boatyard! In the last month there was progress I admit it would take me another year to make!
As I had already cut the lower hullside panels and the bulkheads for the port hull as well, they were easily coated with epoxy, longitudinal stringers, bunk and deck bearers were glued and port hull was assembled within two weeks. There were some problems with making the keel and bulkhead fillets as the yard's shed is open all around. That means it is exposed to outside temperatures, which at this time of the year were between 27-35C, too hot to work with epoxy in narrow spaces (it was steaming like hot Greek coffee!). As a result we left that task to complete later and went back in the completion of glass reinforcing the starboard keel fillets, cutting the floors and rear bunks of starboard hull, cutting and coating the upper hullside panels for both hulls and many other small tasks.
However, the problem now with all that progress on the project is that I have to make a lot of decisions in a short time! Things like water supply, wiring, configuration of the enclosed- in my Tiki 31- central cockpits, beam throughs, deck configuration etc, were supposed to occupy my mind within the next couple of years. Now I have to decide on all these matters in a few weeks! ( I will post on these decisions later)
Hopefully in the next few weeks we will manage to put the final coats of epoxy to the bilges and the space under the bunks of starboard hull, prime and paint them and glue the floors, bunks and upper hullsides. Keel, stem and stern fillets of port hull will be completed at the same time.


Starboard lower hullside panels coated with epoxy





At last a Wharram catamaran!






Galley floors


Rear bunk


Ex open central cockpit, now enclosed galley..

Stem fillets

Κυριακή 16 Αυγούστου 2009

Change of course

Since the beginning of this project, almost three years ago, a lot of things changed in my life. I got married, my daughter was born and hopefully, in a few days my wife will give birth to our son.
As far as the boat is concerned, all these changes ment a considerable reduction in my free time, thus in building time. The distance of the building spot from my house made things even more difficult, resulting in almost zero progress during the last year.
I started building the crossbeams in a friends workshop near my house and for the last three months made an effort to find an inexpensive warehouse closeby to accommodate the hulls. I even traveled to Turkey to see an old Tangaroa which was for sale (..a long story) in an attempt to enter the world of Wharram sailors earlier. It was hopeless! I realised that my only chance to be sailing next summer was to have my boat finished and the only way to do so was by acquiring professional help! It wouldn't be cheap but it would certainly be a lot faster then building alone.
Since my decision was made it was only a matter of finding the appropriate people and moving the unfinished hull and the rest of the material to the boats new home. The appropriate people were Vassiliadis bros, with a long history in boatbuilding, mostly traditional Greek vessels (Traehandere), but also experienced in plywood-epoxy construction methods. They are located in Heraclion city harbour, which is only 10' drive from my house. This makes an almost daily visit possible to attend to a new stage of the construction, to short out some details or complete myself many of the different tasks remaining until the realisation of my Tiki 31.
Moving the hull was another thing...The narrow space outside the garage, where I was building until now, made the approach of a large crane impossible. The only way to take the hull out of there was by man power! A few friends came over and helped me roll the hull on small wheels out of the garage and down the steep and narrow alley of my parents' cottage to the main road where the crane lifted it. Fortunatelly the whole process went by smoothly and a few hours later the hull was lowered in it's new building shed almost thirty kilometers away!













Σάββατο 21 Μαρτίου 2009

Masts and crossbeams

   It has been a while since I last updated this blog. Although I had a lot of other obligations during this period, I didn't neglect the boat at all! As the weather for the last couple of months in Crete was too cold for gluing, glassing, filleting etc, I decided to chanel other time consuming parts of the project such as the masts and the crossbeams. Their construction is straight forward but they consist of numerous components-ply webs, lots of softwood and hardwood parts-that take long to be cut and glued together, a fact that pointed out the significance of a workshop as close to my appartment as possible.
     As mentioned in previous posts, I was in search of such a workshop, so as to be able to spent every free hour on the project. A few days ago, a friend and proffesional carpenter agreed to let me construct a bench in one side of his workshop to glue up the masts and crossbeams. Furthermore, his stuff was willing to help me cut and shape all the wood parts of the assembly.
     The firt thing I had to do was find the appropriate wood needed. This was not easy as Douglas fir or Oregon pine (as is more familiar in Greece), the kind of wood specified for the job, is not very popular among house and furniture constructors lately. As a result wood suppliers in Crete don't import it any more. As if this was not enough, the ammount I needed was about 1,5 m3 and it should be first class. I had to buy from three different suppliers to find the quantity required and discard some when cutting and planing as unsuitable ( from lower quality). Total cost: 1800€ plus some 500€ for more epoxy and materials for the bench...a lot of money for pine...
    The good news is that with the Douglas fir for the masts and crossbeams I have almost bought all the material needed to complete the boat except for some more epoxy and glass cloth. In a later post more economical aspects will be mentioned as I think every future builder of such a boat would be interested in having a realistic estimation of the cost.
     In the photos below the first steps in organizing the construction of the two masts and four crossbeams are shown. Notice the 6m long cleargrained Douglas fir pieces I managed to find in a wood suppliers warehouse (unsought for two years..) and the beautiful Wharram  mast bases that I cut from a piece of oak I found in my friends workshop. Mast crane is from Iroko.  
      
        


6m long Douglas fir pieces. Not easy to handle but will save me a lot of scarf joining!


Cutting the wood

Only half the ammount required!


The two part gluing bench. A third part will be added for gluing the masts




Parts of the mast crane and the two oak bases

Τρίτη 2 Δεκεμβρίου 2008

Heat!

Boatbuilding must progress during the oncoming winter. This requires heat!
Although temperature in Crete is still 15-20C I started experimenting in finding a way to heat the garage.
Aris, a good friend and fan of the project, kindly donated the kerozene heater seen in the pictures below. It is very economic and produces heat constantly, without a thermostat, which makes it ideal for large not fully enclosed spaces. When I tested it though I realized it was small for my boatbuilding shed which has no insulation and part of which is enclosed by iron plates (thus completely exposed to externel temperature changes). Nevertheless, it managed to maintain a stable inside 19C, while the outside temperature fell by nightfall to a prohibiting for epoxy work 15-16C (unfortunatelly the West System 205 hardener which is specified for colder climates is not imported in Greece!?).
As a result I think I will buy an identical heater and with both in use I will be able to use epoxy even during the coldest days of Cretan winter.
During the heaters test I managed to apply the first coat of epoxy on the underside surface of the plywood sheets of the forward bunk and floor and complete some of the keel and bulkhead fillet sanding. As soon as I finish with the glass reinforcement of the keel in this forward compartment I will paint it white before the final installation of the floor and bunk.


Heater in action!


Forward bunk and floor plywood parts cut
and epoxy coated on one side